We have 15 holes for posts dug with an ogger...meaning that they are full of loose dirt since the ogger didn't clean them out. They are about 4 feet deep each. We cleaned out 5 of them and set the posts in those 5. They are leveled and we got concrete poured in 2 of them today before working on the well a little. Tomorrow we plan to at least pour the concrete in the 3 remaining holes that are ready....but we hope to get a few more cleaned out, posts leveled and concrete poured. We went and bought the pressure treated 2x10x12's and the rest of the concrete today. I feel great that we are getting somewhere! Oh, and we set up a small play area for the kiddos near the building site complete with small slides, trucks, shovels, a table, chairs, and a pack n play for when we need to contain Little Man. I plan to keep a running cost total for the whole house, I just need to figure out how to make a list like that on this blog, maybe with a link on the side??